This
is the 3-view image that I used as the basis for my CAD drawings.
All initial design work was drawn in DesignCAD 3D. |
|
Seen
above is the initial kit. Cutting time took about 2.5 hours.
Not shown is the are the wing cores (the reason the cutting
on bulkheads F-5 & F-6 isn't quite finished yet), wing skins,
top sheeting and nose block(s). |
|